Skip to content
MILCNC

Home / Quality

Quality

First article inspection, traceability and inspection records

Defense buyers need proof, not promises. These are the documents we ask matched suppliers to deliver with every program, and the checks we run before a drawing leaves our hands.

Documentation package

What ships with the parts

DocumentWhenContents
First Article Inspection reportEvery new part number or revisionBallooned drawing, every characteristic measured, AS9102-style format on request
CMM reportFAI and per agreed sampling planActual values against nominal and tolerance
Mill certificateEvery batchTraceable to heat number, chemistry and mechanical properties
Certificate of conformanceEvery lotPart number, revision, quantity, lot number
Finish / heat treat certificateEvery lot with a special processProcess spec, type and class, lot reference
Certificate of originOn requestCountry of manufacture for customs and contract clauses
End-use / end-user statementDual-use itemsConfirmed by the buyer before matching

Inspection records are retained for the period your program requires (seven years is common). State the retention period in the RFQ.

First article

FAI before batch release

First Article Inspection runs on every program. The supplier machines the first parts, measures every characteristic on the ballooned drawing on CMM, optical comparator and height gauge, and sends the report. Batch production starts only after you approve the FAI. A change of revision, material source, process or location triggers a new or partial FAI.

What an AS9102-format FAI report contains

Traceability

Material to lot, lot to part

Mill certificates with heat numbers on every batch. Lot tracking from raw stock through final inspection: the supplier logs the lot number per work order, so any part can be traced back to its bar and its inspection record. Country of origin certificates on request.

If your contract carries specialty metals or sourcing clauses, flag them in the RFQ so the supplier buys compliant material from the start.

Process

Four stages, four checkpoints

STAGE 01

NDA and review

Mutual NDA signed first. We review the drawing for completeness, check its export sensitivity and flag risk before any supplier sees it.

STAGE 02

Match and quote

We reply within 24 business hours and match the RFQ with up to 3 suppliers. Each sends DFM feedback and a quote with material certs, FAI plan and lead time.

STAGE 03

FAI and production

First Article Inspection on every program. The FAI is approved before batch release. CMM and optical comparator inspection.

STAGE 04

Pack and ship

EXW default; FOB Cat Lai or Cai Mep on request. Mill certs and the FAI report ship with the lot. Packaging to buyer spec.

Discretion

Drawing handling under NDA

Mutual NDA before any technical data is reviewed. Drawings go only to the suppliers matched to your RFQ (up to 3), each under NDA, never to a public marketplace. Per-program non-compete clauses on request. Files are removed from our records on request after the RFQ closes.

Supplier vetting

How suppliers are screened

Before a supplier receives RFQs we review its machine list, inspection equipment, export experience and any certificates it claims, with certificate numbers we can check. We do not hold certifications ourselves and do not state that a supplier is certified unless it shows the certificate. Verify certificates yourself before ordering.

Need FAI and full traceability on your next lot?

State the documents you need in the RFQ. We reply within 24 business hours.

Send RFQ